Autoplay
Autocomplete
Previous Lesson
Complete and Continue
Advanced - Horizontal and ERD Well Design and Execution Training
1. Running Casing & Liners in Extended Reach Wells
1.1: Design Challenges (12:52)
1.1 Quiz
1.2: Running Casing & Liners (18:55)
1.2 Quiz
1.3: Casing Floatation (15:17)
1.3 Quiz
2. Cementing
2.1: Cementing Challenges in High Angle Wells (11:16)
2.1 Quiz
2.2: Cementing - Casing Centralizers (12:25)
2.2 Quiz
2.3: Pipe Movement (20:25)
2.3 Quiz
3. Torque, Drag, and Hydraulics Modeling
3.1: Introduction to Torque and Drag Modeling (22:10)
3.1 Quiz
3.2: Introduction to Hydraulics Modeling (18:58)
3.2 Quiz
3.3: Hindcasting and Planning (24:10)
3.3 Quiz
4. Additional Risks
4.1: Casing and Drill Pipe Wear (21:50)
4.1 Quiz
4.2: Differential Sticking (14:03)
4.2 Quiz
4.3: Narrow Mud Weight Window (13:57)
4.3 Quiz
5. Drill String Design
5.1: Drill Pipe (12:49)
5.1 Quiz
5.2: API and Premium Connections (13:48)
5.2 Quiz
5.3: Fatigue Mechanisms (18:29)
5.3 Quiz
5.4: Tapered Drill String (14:48)
5.4 Quiz
6. Well Design
6.1: Trajectory Selection (13:41)
6.1 Quiz
6.2: Casing Design (20:06)
6.2 Quiz
6.3: Drill Pipe Selection (25:18)
6.3 Quiz
6.4: Rig Sizing (20:35)
6.4 Quiz
Teach online with
3.3 Quiz
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock